Title 30--Mineral Resources

CHAPTER II--MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR

PART 250--OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF


TEXT PDF250.101 Authority and applicability.
TEXT PDF250.102 What does this part do?
TEXT PDF250.103 Where can I find more information about the requirements in this part?
TEXT PDF250.104 How may I appeal a decision made under MMS regulations?
TEXT PDF250.105 Definitions.
TEXT PDF250.106 What standards will the Director use to regulate lease operations?
TEXT PDF250.107 What must I do to protect health, safety, property, and the environment?
TEXT PDF250.108 What requirements must I follow for cranes and other material-handling equipment?
TEXT PDF250.109 What documents must I prepare and maintain related to welding?
TEXT PDF250.110 What must I include in my welding plan?
TEXT PDF250.111 Who oversees operations under my welding plan?
TEXT PDF250.112 What standards must my welding equipment meet?
TEXT PDF250.113 What procedures must I follow when welding?
TEXT PDF250.114 How must I install and operate electrical equipment?
TEXT PDF250.115 How do I determine well producibility?
TEXT PDF250.116 How do I determine producibility if my well is in the Gulf of Mexico?
TEXT PDF250.117 How does a determination of well producibility affect royalty status?
TEXT PDF250.118 Will MMS approve gas injection?
TEXT PDF250.119 Will MMS approve subsurface gas storage?
TEXT PDF250.120 How does injecting, storing, or treating gas affect my royalty payments?
TEXT PDF250.121 What happens when the reservoir contains both original gas in place and injected gas?
TEXT PDF250.122 What effect does subsurface storage have on the lease term?
TEXT PDF250.123 Will MMS allow gas storage on unleased lands?
TEXT PDF250.124 Will MMS approve gas injection into the cap rock containing a sulphur deposit?
TEXT PDF250.130 Why does MMS conduct inspections?
TEXT PDF250.131 Will MMS notify me before conducting an inspection?
TEXT PDF250.132 What must I do when MMS conducts an inspection?
TEXT PDF250.133 Will MMS reimburse me for my expenses related to inspections?
TEXT PDF250.135 What will MMS do if my operating performance is unacceptable?
TEXT PDF250.136 How will MMS determine if my operating performance is unacceptable?
TEXT PDF250.140 When will I receive an oral approval?
TEXT PDF250.141 May I ever use alternate procedures or equipment?
TEXT PDF250.142 How do I receive approval for departures?
TEXT PDF250.143 How do I designate an operator?
TEXT PDF250.144 How do I designate a new operator when a designation of operator terminates?
TEXT PDF250.145 How do I designate an agent or a local agent?
TEXT PDF250.146 Who is responsible for fulfilling leasehold obligations?
TEXT PDF250.150 How do I name facilities and wells in the Gulf of Mexico Region?
TEXT PDF250.151 How do I name facilities in the Pacific Region?
TEXT PDF250.152 How do I name facilities in the Alaska Region?
TEXT PDF250.153 Do I have to rename an existing facility or well?
TEXT PDF250.154 What identification signs must I display?
TEXT PDF250.160 When will MMS grant me a right-of-use and easement, and what requirements must I meet?
TEXT PDF250.161 What else must I submit with my application?
TEXT PDF250.162 May I continue my right-of-use and easement after the termination of any lease on which it is situated?
TEXT PDF250.163 If I have a State lease, will MMS grant me a right-of-use and easement?
TEXT PDF250.164 If I have a State lease, what conditions apply for a right-of-use and easement?
TEXT PDF250.165 If I have a State lease, what fees do I have to pay for a right-of-use and easement?
TEXT PDF250.166 If I have a State lease, what surety bond must I have for a right-of-use and easement?
TEXT PDF250.168 May operations or production be suspended?
TEXT PDF250.169 What effect does suspension have on my lease?
TEXT PDF250.170 How long does a suspension last?
TEXT PDF250.171 How do I request a suspension?
TEXT PDF250.172 When may the Regional Supervisor grant or direct an SOO or SOP?
TEXT PDF250.173 When may the Regional Supervisor direct an SOO or SOP?
TEXT PDF250.174 When may the Regional Supervisor grant or direct an SOP?
TEXT PDF250.175 When may the Regional Supervisor grant an SOO?
TEXT PDF250.176 Does a suspension affect my royalty payment?
TEXT PDF250.177 What additional requirements may the Regional Supervisor order for a suspension?
TEXT PDF250.180 What am I required to do to keep my lease term in effect?
TEXT PDF250.181 When may the Secretary cancel my lease and when am I compensated for cancellation?
TEXT PDF250.182 When may the Secretary cancel a lease at the exploration stage?
TEXT PDF250.183 When may MMS or the Secretary extend or cancel a lease at the development and production stage?
TEXT PDF250.184 What is the amount of compensation for lease cancellation?
TEXT PDF250.185 When is there no compensation for a lease cancellation?
TEXT PDF250.190 What reporting information and report forms must I submit?
TEXT PDF250.191 What accident reports must I submit?
TEXT PDF250.192 What evacuation statistics must I submit?
TEXT PDF250.193 Reports and investigations of apparent violations.
TEXT PDF250.194 What archaeological reports and surveys must I submit?
TEXT PDF250.195 Reimbursements for reproduction and processing costs.
TEXT PDF250.196 Data and information to be made available to the public.
TEXT PDF250.198 Documents incorporated by reference.
TEXT PDF250.199 Paperwork Reduction Act statements--information collection.
TEXT PDF250.200 General requirements.
TEXT PDF250.201 Preliminary activities.
TEXT PDF250.202 Well location and spacing.
TEXT PDF250.203 Exploration Plan.
TEXT PDF250.204 Development and Production Plan.
TEXT PDF250.300 Pollution prevention.
TEXT PDF250.301 Inspection of facilities.
TEXT PDF250.302 Definitions concerning air quality.
TEXT PDF250.303 Facilities described in a new or revised Exploration Plan or Development and Production Plan.
TEXT PDF250.304 Existing facilities.
TEXT PDF250.400 Control of wells.
TEXT PDF250.401 General requirements.
TEXT PDF250.404 Well casing and cementing.
TEXT PDF250.405 Pressure testing of casing.
TEXT PDF250.406 Blowout preventer systems and system components.
TEXT PDF250.407 Blowout preventer (BOP) system tests, inspections, and maintenance.
TEXT PDF250.408 Well-control drills.
TEXT PDF250.409 Diverter systems.
TEXT PDF250.410 Mud program.
TEXT PDF250.411 Securing of wells.
TEXT PDF250.412 Field drilling rules.
TEXT PDF250.413 Supervision, surveillance, and training.
TEXT PDF250.414 Applications for permit to drill.
TEXT PDF250.415 Sundry notices and reports on wells.
TEXT PDF250.416 Well records.
TEXT PDF250.417 Hydrogen sulfide.
TEXT PDF250.500 General requirements.
TEXT PDF250.501 Definition.
TEXT PDF250.502 Equipment movement.
TEXT PDF250.503 Emergency shutdown system.
TEXT PDF250.504 Hydrogen sulfide.
TEXT PDF250.505 Subsea completions.
TEXT PDF250.506 Crew instructions.
TEXT PDF250.509 Well-completion structures on fixed platforms.
TEXT PDF250.510 Diesel engine air intakes.
TEXT PDF250.511 Traveling-block safety device.
TEXT PDF250.512 Field well-completion rules.
TEXT PDF250.513 Approval and reporting of well-completion operations.
TEXT PDF250.514 Well-control fluids, equipment, and operations.
TEXT PDF250.515 Blowout prevention equipment.
TEXT PDF250.516 Blowout preventer system tests, inspections, and maintenance.
TEXT PDF250.517 Tubing and wellhead equipment.
TEXT PDF250.600 General requirements.
TEXT PDF250.601 Definitions.
TEXT PDF250.602 Equipment movement.
TEXT PDF250.603 Emergency shutdown system.
TEXT PDF250.604 Hydrogen sulfide.
TEXT PDF250.605 Subsea workovers.
TEXT PDF250.606 Crew instructions.
TEXT PDF250.609 Well-workover structures on fixed platforms.
TEXT PDF250.610 Diesel engine air intakes.
TEXT PDF250.611 Traveling-block safety device.
TEXT PDF250.612 Field well-workover rules.
TEXT PDF250.613 Approval and reporting for well-workover operations.
TEXT PDF250.614 Well-control fluids, equipment, and operations.
TEXT PDF250.615 Blowout prevention equipment.
TEXT PDF250.616 Blowout preventer system testing, records, and drills.
TEXT PDF250.617 Tubing and wellhead equipment.
TEXT PDF250.618 Wireline operations.
TEXT PDF250.700 General requirements.
TEXT PDF250.701 Approvals.
TEXT PDF250.702 Permanent abandonment.
TEXT PDF250.703 Temporary abandonment.
TEXT PDF250.704 Site clearance verification.
TEXT PDF250.800 General requirements.
TEXT PDF250.801 Subsurface safety devices.
TEXT PDF250.802 Design, installation, and operation of surface production-safety systems.
TEXT PDF250.803 Additional production system requirements.
TEXT PDF250.804 Production safety-system testing and records.
TEXT PDF250.805 Safety device training.
TEXT PDF250.806 Safety and pollution prevention equipment quality assurance requirements.
TEXT PDF250.807 Hydrogen sulfide.
TEXT PDF250.900 General requirements.
TEXT PDF250.901 Application for approval.
TEXT PDF250.902 Platform Verification Program requirements.
TEXT PDF250.903 Certified Verification Agent duties and nomination.
TEXT PDF250.904 Environmental conditions.
TEXT PDF250.905 Loads.
TEXT PDF250.906 General design requirements.
TEXT PDF250.907 Steel platforms.
TEXT PDF250.908 Concrete-gravity platforms.
TEXT PDF250.909 Foundation.
TEXT PDF250.910 Marine operations.
TEXT PDF250.911 Inspection during construction.
TEXT PDF250.912 Periodic inspection and maintenance.
TEXT PDF250.913 Platform removal and location clearance.
TEXT PDF250.914 Records.
TEXT PDF250.1000 General requirements.
TEXT PDF250.1001 Definitions.
TEXT PDF250.1002 Design requirements for DOI pipelines.
TEXT PDF250.1003 Installation, testing, and repair requirements for DOI pipelines.
TEXT PDF250.1004 Safety equipment requirements for DOI pipelines.
TEXT PDF250.1005 Inspection requirements for DOI pipelines.
TEXT PDF250.1006 Abandonment and out-of-service requirements for DOI pipelines.
TEXT PDF250.1007 What to include in applications.
TEXT PDF250.1008 Reports.
TEXT PDF250.1009 General requirements for a pipeline right-of-way grant.
TEXT PDF250.1010 Applications for a pipeline right-of-way grant.
TEXT PDF250.1011 Granting a pipeline right-of-way.
TEXT PDF250.1012 Requirements for construction under a right-of-way grant.
TEXT PDF250.1013 Assignment of a right-of-way grant.
TEXT PDF250.1014 Relinquishment of a right-of-way grant.
TEXT PDF250.1100 Definitions for production rates.
TEXT PDF250.1101 General requirements and classification of reservoirs.
TEXT PDF250.1102 Oil and gas production rates.
TEXT PDF250.1103 Well production testing.
TEXT PDF250.1104 Bottomhole pressure survey.
TEXT PDF250.1105 Flaring or venting gas and burning liquid hydrocarbons.
TEXT PDF250.1106 Downhole commingling.
TEXT PDF250.1107 Enhanced oil and gas recovery operations.
TEXT PDF250.1200 Question index table.
TEXT PDF250.1201 Definitions.
TEXT PDF250.1202 Liquid hydrocarbon measurement.
TEXT PDF250.1203 Gas measurement.
TEXT PDF250.1204 Surface commingling.
TEXT PDF250.1205 Site security.
TEXT PDF250.1300 What is the purpose of this subpart?
TEXT PDF250.1301 What are the requirements for unitization?
TEXT PDF250.1302 What if I have a competitive reservoir on a lease?
TEXT PDF250.1303 How do I apply for voluntary unitization?
TEXT PDF250.1304 How will MMS require unitization?
TEXT PDF250.1400 How does MMS begin the civil penalty process?
TEXT PDF250.1401 Index table.
TEXT PDF250.1402 Definitions.
TEXT PDF250.1403 What is the maximum civil penalty?
TEXT PDF250.1404 Which violations will MMS review for potential civil penalties?
TEXT PDF250.1405 When is a case file developed?
TEXT PDF250.1406 When will MMS notify me and provide penalty information?
TEXT PDF250.1407 How do I respond to the letter of notification?
TEXT PDF250.1408 When will I be notified of the Reviewing Officer's decision?
TEXT PDF250.1409 What are my appeal rights?
TEXT PDF250.1500 Definitions.
TEXT PDF250.1501 What is the goal of my training program?
TEXT PDF250.1502 Is there a transition period for complying with the regulations in this subpart?
TEXT PDF250.1503 What are my general responsibilities for training?
TEXT PDF250.1504 May I use alternative training methods?
TEXT PDF250.1505 Where may I get training for my employees?
TEXT PDF250.1506 How often must I train my employees?
TEXT PDF250.1507 How will MMS measure training results?
TEXT PDF250.1508 What must I do when MMS administers written or oral tests?
TEXT PDF250.1509 What must I do when MMS administers or requires hands-on, simulator, or other types of testing?
TEXT PDF250.1510 What will MMS do if my training program does not comply with this subpart?
TEXT PDF250.1600 Performance standard.
TEXT PDF250.1601 Definitions.
TEXT PDF250.1602 Applicability.
TEXT PDF250.1603 Determination of sulphur deposit.
TEXT PDF250.1604 General requirements.
TEXT PDF250.1605 Drilling requirements.
TEXT PDF250.1606 Control of wells.
TEXT PDF250.1607 Field rules.
TEXT PDF250.1608 Well casing and cementing.
TEXT PDF250.1609 Pressure testing of casing.
TEXT PDF250.1610 Blowout preventer systems and system components.
TEXT PDF250.1611 Blowout preventer systems tests, actuations, inspections, and maintenance.
TEXT PDF250.1612 Well-control drills.
TEXT PDF250.1613 Diverter systems.
TEXT PDF250.1614 Mud program.
TEXT PDF250.1615 Securing of wells.
TEXT PDF250.1616 Supervision, surveillance, and training.
TEXT PDF250.1617 Application for permit to drill.
TEXT PDF250.1618 Sundry notices and reports on wells.
TEXT PDF250.1619 Well records.
TEXT PDF250.1620 Well-completion and well-workover requirements.
TEXT PDF250.1621 Crew instructions.
TEXT PDF250.1622 Approvals and reporting of well-completion and well-workover operations.
TEXT PDF250.1623 Well-control fluids, equipment, and operations.
TEXT PDF250.1624 Blowout prevention equipment.
TEXT PDF250.1625 Blowout preventer system testing, records, and drills.
TEXT PDF250.1626 Tubing and wellhead equipment.
TEXT PDF250.1627 Production requirements.
TEXT PDF250.1628 Design, installation, and operation of production systems.
TEXT PDF250.1629 Additional production and fuel gas system requirements.
TEXT PDF250.1630 Safety-system testing and records.
TEXT PDF250.1631 Safety device training.
TEXT PDF250.1632 Production rates.
TEXT PDF250.1633 Production measurement.
TEXT PDF250.1634 Site security.


---------------------------------------------------------------------
-----------

[BACK ][BACK ]