Title 30--Mineral Resources
CHAPTER II--MINERALS MANAGEMENT SERVICE,
DEPARTMENT OF THE INTERIOR
PART 250--OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF
|
 |
 | 250.101 |
Authority and applicability. |
 |
 | 250.102 |
What does this part do? |
 |
 | 250.103 |
Where can I find more information about the requirements in this part? |
 |
 | 250.104 |
How may I appeal a decision made under MMS regulations? |
 |
 | 250.105 |
Definitions. |
 |
 | 250.106 |
What standards will the Director use to regulate lease operations? |
 |
 | 250.107 |
What must I do to protect health, safety, property, and the environment? |
 |
 | 250.108 |
What requirements must I follow for cranes and other material-handling equipment? |
 |
 | 250.109 |
What documents must I prepare and maintain related to welding? |
 |
 | 250.110 |
What must I include in my welding plan? |
 |
 | 250.111 |
Who oversees operations under my welding plan? |
 |
 | 250.112 |
What standards must my welding equipment meet? |
 |
 | 250.113 |
What procedures must I follow when welding? |
 |
 | 250.114 |
How must I install and operate electrical equipment? |
 |
 | 250.115 |
How do I determine well producibility? |
 |
 | 250.116 |
How do I determine producibility if my well is in the Gulf of Mexico? |
 |
 | 250.117 |
How does a determination of well producibility affect royalty status? |
 |
 | 250.118 |
Will MMS approve gas injection? |
 |
 | 250.119 |
Will MMS approve subsurface gas storage? |
 |
 | 250.120 |
How does injecting, storing, or treating gas affect my royalty payments? |
 |
 | 250.121 |
What happens when the reservoir contains both original gas in place and injected gas? |
 |
 | 250.122 |
What effect does subsurface storage have on the lease term? |
 |
 | 250.123 |
Will MMS allow gas storage on unleased lands? |
 |
 | 250.124 |
Will MMS approve gas injection into the cap rock containing a sulphur deposit? |
 |
 | 250.130 |
Why does MMS conduct inspections? |
 |
 | 250.131 |
Will MMS notify me before conducting an inspection? |
 |
 | 250.132 |
What must I do when MMS conducts an inspection? |
 |
 | 250.133 |
Will MMS reimburse me for my expenses related to inspections? |
 |
 | 250.135 |
What will MMS do if my operating performance is unacceptable? |
 |
 | 250.136 |
How will MMS determine if my operating performance is unacceptable? |
 |
 | 250.140 |
When will I receive an oral approval? |
 |
 | 250.141 |
May I ever use alternate procedures or equipment? |
 |
 | 250.142 |
How do I receive approval for departures? |
 |
 | 250.143 |
How do I designate an operator? |
 |
 | 250.144 |
How do I designate a new operator when a designation of operator terminates? |
 |
 | 250.145 |
How do I designate an agent or a local agent? |
 |
 | 250.146 |
Who is responsible for fulfilling leasehold obligations? |
 |
 | 250.150 |
How do I name facilities and wells in the Gulf of Mexico Region? |
 |
 | 250.151 |
How do I name facilities in the Pacific Region? |
 |
 | 250.152 |
How do I name facilities in the Alaska Region? |
 |
 | 250.153 |
Do I have to rename an existing facility or well? |
 |
 | 250.154 |
What identification signs must I display? |
 |
 | 250.160 |
When will MMS grant me a right-of-use and easement, and what requirements must I meet? |
 |
 | 250.161 |
What else must I submit with my application? |
 |
 | 250.162 |
May I continue my right-of-use and easement after the termination of any lease on which it is situated? |
 |
 | 250.163 |
If I have a State lease, will MMS grant me a right-of-use and easement? |
 |
 | 250.164 |
If I have a State lease, what conditions apply for a right-of-use and easement? |
 |
 | 250.165 |
If I have a State lease, what fees do I have to pay for a right-of-use and easement? |
 |
 | 250.166 |
If I have a State lease, what surety bond must I have for a right-of-use and easement? |
 |
 | 250.168 |
May operations or production be suspended? |
 |
 | 250.169 |
What effect does suspension have on my lease? |
 |
 | 250.170 |
How long does a suspension last? |
 |
 | 250.171 |
How do I request a suspension? |
 |
 | 250.172 |
When may the Regional Supervisor grant or direct an SOO or SOP? |
 |
 | 250.173 |
When may the Regional Supervisor direct an SOO or SOP? |
 |
 | 250.174 |
When may the Regional Supervisor grant or direct an SOP? |
 |
 | 250.175 |
When may the Regional Supervisor grant an SOO? |
 |
 | 250.176 |
Does a suspension affect my royalty payment? |
 |
 | 250.177 |
What additional requirements may the Regional Supervisor order for a suspension? |
 |
 | 250.180 |
What am I required to do to keep my lease term in effect? |
 |
 | 250.181 |
When may the Secretary cancel my lease and when am I compensated for cancellation? |
 |
 | 250.182 |
When may the Secretary cancel a lease at the exploration stage? |
 |
 | 250.183 |
When may MMS or the Secretary extend or cancel a lease at the development and production stage? |
 |
 | 250.184 |
What is the amount of compensation for lease cancellation? |
 |
 | 250.185 |
When is there no compensation for a lease cancellation? |
 |
 | 250.190 |
What reporting information and report forms must I submit? |
 |
 | 250.191 |
What accident reports must I submit? |
 |
 | 250.192 |
What evacuation statistics must I submit? |
 |
 | 250.193 |
Reports and investigations of apparent violations. |
 |
 | 250.194 |
What archaeological reports and surveys must I submit? |
 |
 | 250.195 |
Reimbursements for reproduction and processing costs. |
 |
 | 250.196 |
Data and information to be made available to the public. |
 |
 | 250.198 |
Documents incorporated by reference.
|
 |
 | 250.199 |
Paperwork Reduction Act statements--information collection. |
 |
 | 250.200 |
General requirements. |
 |
 | 250.201 |
Preliminary activities. |
 |
 | 250.202 |
Well location and spacing. |
 |
 | 250.203 |
Exploration Plan. |
 |
 | 250.204 |
Development and Production Plan. |
 |
 | 250.300 |
Pollution prevention. |
 |
 | 250.301 |
Inspection of facilities. |
 |
 | 250.302 |
Definitions concerning air quality. |
 |
 | 250.303 |
Facilities described in a new or revised Exploration Plan or Development and Production Plan. |
 |
 | 250.304 |
Existing facilities. |
 |
 | 250.400 |
Control of wells. |
 |
 | 250.401 |
General requirements. |
 |
 | 250.404 |
Well casing and cementing. |
 |
 | 250.405 |
Pressure testing of casing. |
 |
 | 250.406 |
Blowout preventer systems and system components. |
 |
 | 250.407 |
Blowout preventer (BOP) system tests, inspections, and maintenance. |
 |
 | 250.408 |
Well-control drills. |
 |
 | 250.409 |
Diverter systems. |
 |
 | 250.410 |
Mud program. |
 |
 | 250.411 |
Securing of wells. |
 |
 | 250.412 |
Field drilling rules. |
 |
 | 250.413 |
Supervision, surveillance, and training. |
 |
 | 250.414 |
Applications for permit to drill. |
 |
 | 250.415 |
Sundry notices and reports on wells. |
 |
 | 250.416 |
Well records. |
 |
 | 250.417 |
Hydrogen sulfide. |
 |
 | 250.500 |
General requirements. |
 |
 | 250.501 |
Definition. |
 |
 | 250.502 |
Equipment movement. |
 |
 | 250.503 |
Emergency shutdown system. |
 |
 | 250.504 |
Hydrogen sulfide. |
 |
 | 250.505 |
Subsea completions. |
 |
 | 250.506 |
Crew instructions. |
 |
 | 250.509 |
Well-completion structures on fixed platforms. |
 |
 | 250.510 |
Diesel engine air intakes. |
 |
 | 250.511 |
Traveling-block safety device. |
 |
 | 250.512 |
Field well-completion rules. |
 |
 | 250.513 |
Approval and reporting of well-completion operations. |
 |
 | 250.514 |
Well-control fluids, equipment, and operations. |
 |
 | 250.515 |
Blowout prevention equipment. |
 |
 | 250.516 |
Blowout preventer system tests, inspections, and maintenance. |
 |
 | 250.517 |
Tubing and wellhead equipment. |
 |
 | 250.600 |
General requirements. |
 |
 | 250.601 |
Definitions. |
 |
 | 250.602 |
Equipment movement. |
 |
 | 250.603 |
Emergency shutdown system. |
 |
 | 250.604 |
Hydrogen sulfide. |
 |
 | 250.605 |
Subsea workovers. |
 |
 | 250.606 |
Crew instructions. |
 |
 | 250.609 |
Well-workover structures on fixed platforms. |
 |
 | 250.610 |
Diesel engine air intakes. |
 |
 | 250.611 |
Traveling-block safety device. |
 |
 | 250.612 |
Field well-workover rules. |
 |
 | 250.613 |
Approval and reporting for well-workover operations. |
 |
 | 250.614 |
Well-control fluids, equipment, and operations. |
 |
 | 250.615 |
Blowout prevention equipment. |
 |
 | 250.616 |
Blowout preventer system testing, records, and drills. |
 |
 | 250.617 |
Tubing and wellhead equipment. |
 |
 | 250.618 |
Wireline operations. |
 |
 | 250.700 |
General requirements. |
 |
 | 250.701 |
Approvals. |
 |
 | 250.702 |
Permanent abandonment. |
 |
 | 250.703 |
Temporary abandonment. |
 |
 | 250.704 |
Site clearance verification. |
 |
 | 250.800 |
General requirements. |
 |
 | 250.801 |
Subsurface safety devices. |
 |
 | 250.802 |
Design, installation, and operation of surface production-safety systems. |
 |
 | 250.803 |
Additional production system requirements. |
 |
 | 250.804 |
Production safety-system testing and records. |
 |
 | 250.805 |
Safety device training. |
 |
 | 250.806 |
Safety and pollution prevention equipment quality assurance requirements.
|
 |
 | 250.807 |
Hydrogen sulfide. |
 |
 | 250.900 |
General requirements. |
 |
 | 250.901 |
Application for approval. |
 |
 | 250.902 |
Platform Verification Program requirements. |
 |
 | 250.903 |
Certified Verification Agent duties and nomination. |
 |
 | 250.904 |
Environmental conditions. |
 |
 | 250.905 |
Loads. |
 |
 | 250.906 |
General design requirements. |
 |
 | 250.907 |
Steel platforms. |
 |
 | 250.908 |
Concrete-gravity platforms. |
 |
 | 250.909 |
Foundation. |
 |
 | 250.910 |
Marine operations. |
 |
 | 250.911 |
Inspection during construction. |
 |
 | 250.912 |
Periodic inspection and maintenance. |
 |
 | 250.913 |
Platform removal and location clearance. |
 |
 | 250.914 |
Records. |
 |
 | 250.1000 |
General requirements. |
 |
 | 250.1001 |
Definitions. |
 |
 | 250.1002 |
Design requirements for DOI pipelines. |
 |
 | 250.1003 |
Installation, testing, and repair requirements for DOI pipelines. |
 |
 | 250.1004 |
Safety equipment requirements for DOI pipelines. |
 |
 | 250.1005 |
Inspection requirements for DOI pipelines. |
 |
 | 250.1006 |
Abandonment and out-of-service requirements for DOI pipelines. |
 |
 | 250.1007 |
What to include in applications. |
 |
 | 250.1008 |
Reports. |
 |
 | 250.1009 |
General requirements for a pipeline right-of-way grant. |
 |
 | 250.1010 |
Applications for a pipeline right-of-way grant. |
 |
 | 250.1011 |
Granting a pipeline right-of-way. |
 |
 | 250.1012 |
Requirements for construction under a right-of-way grant. |
 |
 | 250.1013 |
Assignment of a right-of-way grant. |
 |
 | 250.1014 |
Relinquishment of a right-of-way grant. |
 |
 | 250.1100 |
Definitions for production rates. |
 |
 | 250.1101 |
General requirements and classification of reservoirs. |
 |
 | 250.1102 |
Oil and gas production rates. |
 |
 | 250.1103 |
Well production testing. |
 |
 | 250.1104 |
Bottomhole pressure survey. |
 |
 | 250.1105 |
Flaring or venting gas and burning liquid hydrocarbons. |
 |
 | 250.1106 |
Downhole commingling. |
 |
 | 250.1107 |
Enhanced oil and gas recovery operations. |
 |
 | 250.1200 |
Question index table. |
 |
 | 250.1201 |
Definitions. |
 |
 | 250.1202 |
Liquid hydrocarbon measurement. |
 |
 | 250.1203 |
Gas measurement. |
 |
 | 250.1204 |
Surface commingling. |
 |
 | 250.1205 |
Site security. |
 |
 | 250.1300 |
What is the purpose of this subpart? |
 |
 | 250.1301 |
What are the requirements for unitization? |
 |
 | 250.1302 |
What if I have a competitive reservoir on a lease? |
 |
 | 250.1303 |
How do I apply for voluntary unitization? |
 |
 | 250.1304 |
How will MMS require unitization? |
 |
 | 250.1400 |
How does MMS begin the civil penalty process? |
 |
 | 250.1401 |
Index table. |
 |
 | 250.1402 |
Definitions. |
 |
 | 250.1403 |
What is the maximum civil penalty? |
 |
 | 250.1404 |
Which violations will MMS review for potential civil penalties? |
 |
 | 250.1405 |
When is a case file developed? |
 |
 | 250.1406 |
When will MMS notify me and provide penalty information? |
 |
 | 250.1407 |
How do I respond to the letter of notification? |
 |
 | 250.1408 |
When will I be notified of the Reviewing Officer's decision? |
 |
 | 250.1409 |
What are my appeal rights? |
 |
 | 250.1500 |
Definitions. |
 |
 | 250.1501 |
What is the goal of my training program? |
 |
 | 250.1502 |
Is there a transition period for complying with the regulations in this subpart? |
 |
 | 250.1503 |
What are my general responsibilities for training? |
 |
 | 250.1504 |
May I use alternative training methods? |
 |
 | 250.1505 |
Where may I get training for my employees? |
 |
 | 250.1506 |
How often must I train my employees? |
 |
 | 250.1507 |
How will MMS measure training results? |
 |
 | 250.1508 |
What must I do when MMS administers written or oral tests? |
 |
 | 250.1509 |
What must I do when MMS administers or requires hands-on, simulator, or other types of testing? |
 |
 | 250.1510 |
What will MMS do if my training program does not comply with this subpart? |
 |
 | 250.1600 |
Performance standard. |
 |
 | 250.1601 |
Definitions. |
 |
 | 250.1602 |
Applicability. |
 |
 | 250.1603 |
Determination of sulphur deposit. |
 |
 | 250.1604 |
General requirements. |
 |
 | 250.1605 |
Drilling requirements. |
 |
 | 250.1606 |
Control of wells. |
 |
 | 250.1607 |
Field rules. |
 |
 | 250.1608 |
Well casing and cementing. |
 |
 | 250.1609 |
Pressure testing of casing. |
 |
 | 250.1610 |
Blowout preventer systems and system components. |
 |
 | 250.1611 |
Blowout preventer systems tests, actuations, inspections, and maintenance. |
 |
 | 250.1612 |
Well-control drills. |
 |
 | 250.1613 |
Diverter systems. |
 |
 | 250.1614 |
Mud program. |
 |
 | 250.1615 |
Securing of wells. |
 |
 | 250.1616 |
Supervision, surveillance, and training. |
 |
 | 250.1617 |
Application for permit to drill. |
 |
 | 250.1618 |
Sundry notices and reports on wells. |
 |
 | 250.1619 |
Well records. |
 |
 | 250.1620 |
Well-completion and well-workover requirements. |
 |
 | 250.1621 |
Crew instructions. |
 |
 | 250.1622 |
Approvals and reporting of well-completion and well-workover operations. |
 |
 | 250.1623 |
Well-control fluids, equipment, and operations. |
 |
 | 250.1624 |
Blowout prevention equipment. |
 |
 | 250.1625 |
Blowout preventer system testing, records, and drills. |
 |
 | 250.1626 |
Tubing and wellhead equipment. |
 |
 | 250.1627 |
Production requirements. |
 |
 | 250.1628 |
Design, installation, and operation of production systems. |
 |
 | 250.1629 |
Additional production and fuel gas system requirements. |
 |
 | 250.1630 |
Safety-system testing and records. |
 |
 | 250.1631 |
Safety device training. |
 |
 | 250.1632 |
Production rates. |
 |
 | 250.1633 |
Production measurement. |
 |
 | 250.1634 |
Site security. |