Title 46--Shipping

CHAPTER I--COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED)

PART 76--FIRE PROTECTION EQUIPMENT


TEXT PDF76.01-1 General.
TEXT PDF76.01-2 Incorporation by reference.
TEXT PDF76.01-5 Equipment installed but not required.
TEXT PDF76.05-1 Fire detecting systems.
TEXT PDF76.05-5 Manual alarm system.
TEXT PDF76.05-10 Supervised patrol system.
TEXT PDF76.05-15 Fire main system.
TEXT PDF76.05-20 Fixed fire extinguishing systems.
TEXT PDF76.05-25 Hand portable fire extinguishers and semiportable fire extinguishing systems.
TEXT PDF76.10-1 Application.
TEXT PDF76.10-3 Water availability.
TEXT PDF76.10-5 Fire pumps.
TEXT PDF76.10-10 Fire station hydrants, hose and nozzles-T/ALL.
TEXT PDF76.10-15 Piping.
TEXT PDF76.10-90 Installations contracted for prior to May 26, 1965.
TEXT PDF76.13-1 Application.
TEXT PDF76.13-90 Installations contracted for prior to January 1, 1962.
TEXT PDF76.15-1 Application.
TEXT PDF76.15-5 Quantity, pipe sizes, and discharge rate.
TEXT PDF76.15-10 Controls.
TEXT PDF76.15-15 Piping.
TEXT PDF76.15-20 Carbon dioxide storage.
TEXT PDF76.15-25 Discharge outlets.
TEXT PDF76.15-30 Alarms.
TEXT PDF76.15-35 Enclosure openings.
TEXT PDF76.15-40 Pressure relief.
TEXT PDF76.15-90 Installations contracted for prior to November 19, 1952.
TEXT PDF76.17-1 Application.
TEXT PDF76.17-5 Quantity of foam required.
TEXT PDF76.17-10 Controls.
TEXT PDF76.17-15 Piping.
TEXT PDF76.17-20 Discharge outlets.
TEXT PDF76.17-25 Additional protection required.
TEXT PDF76.17-90 Installations contracted for prior to November 19, 1952.
TEXT PDF76.23-1 Application.
TEXT PDF76.23-5 Zoning.
TEXT PDF76.23-10 Quantity, pipe sizes, and discharge rates.
TEXT PDF76.23-15 Controls.
TEXT PDF76.23-20 Piping.
TEXT PDF76.23-25 Sprinkler heads.
TEXT PDF76.23-90 Installations contracted for prior to November 19, 1952.
TEXT PDF76.25-1 Application.
TEXT PDF76.25-5 Zoning.
TEXT PDF76.25-10 Size and arrangement of sprinkler heads and pipe sizes.
TEXT PDF76.25-15 Pumps and water supply.
TEXT PDF76.25-20 Pressure tank.
TEXT PDF76.25-25 Controls.
TEXT PDF76.25-30 Piping.
TEXT PDF76.25-35 Operation and installation.
TEXT PDF76.25-90 Installations contracted for prior to September 30, 1997.
TEXT PDF76.27-1 Application.
TEXT PDF76.27-5 Zoning.
TEXT PDF76.27-10 Location and spacing of detectors.
TEXT PDF76.27-15 Operation and installation.
TEXT PDF76.27-90 Installations contracted for prior to November 19, 1952.
TEXT PDF76.30-1 Application.
TEXT PDF76.30-5 Zoning.
TEXT PDF76.30-10 Location and spacing of tubing.
TEXT PDF76.30-15 Operation and installation.
TEXT PDF76.30-90 Installations contracted for prior to November 19, 1952.
TEXT PDF76.33-1 Application.
TEXT PDF76.33-5 Zoning.
TEXT PDF76.33-10 Location and spacing of accumulators.
TEXT PDF76.33-15 Piping.
TEXT PDF76.33-20 Operation and installation.
TEXT PDF76.33-90 Installations contracted for prior to November 19, 1952.
TEXT PDF76.35-1 Application.
TEXT PDF76.35-5 Zoning.
TEXT PDF76.35-10 Location and spacing of manual alarm boxes.
TEXT PDF76.35-15 Operation and installation.
TEXT PDF76.35-90 Installations contracted for prior to November 19, 1952.
TEXT PDF76.50-1 Application.
TEXT PDF76.50-5 Classification.
TEXT PDF76.50-10 Location.
TEXT PDF76.50-15 Spare charges.
TEXT PDF76.50-20 Semiportable fire extinguishers.
TEXT PDF76.50-90 Vessels contracted for prior to November 19, 1952.
TEXT PDF76.60-1 Application.
TEXT PDF76.60-5 Number required.
TEXT PDF76.60-10 Location.


---------------------------------------------------------------------
-----------